Engineering Case Studies

Compare project scale, feed or process stream, and the membrane sections actually used across tubular membrane engineering, industrial wastewater reuse and ZLD, and process-fluid separation.

All case studies (72)

Showing 25–36 of 72

All case studies

Equipment for the 400 m³/d landfill leachate ammonia stripping project

Industrial Wastewater Reuse & ZLD

400 m³/d Landfill Leachate Ammonia Stripping Validation

Project scale
400 m³/d
Feed / process stream
Aged landfill leachate
Membrane sections
Preheat/desorption + ammonia stripping + absorption/downstream biology interface

Reduce front-end ammonia loading and define gas, liquid, absorption, and downstream biological interfaces.

The capacity and membrane sections document this reference only; they do not establish design or performance for a new duty.

View case details →
Process equipment at the 500 L/h Lithium-Extraction Membrane Separation and Concentration Pilot

Industrial Wastewater Reuse & ZLD

500 L/h Lithium-Extraction Membrane Separation and Concentration Pilot

Project scale
500 L/h
Feed / process stream
Salt-lake brine and ore-leach liquor for lithium extraction
Membrane sections
Conditioning, softening and PEK clarification combined with resin adsorption, NF salt separation, RO concentration and downstream lithium-recovery stages

This 500 L/h pilot platform evaluates salt-lake brine and lithium-bearing ore-leach liquor. PEK tubular membranes, resin adsorption, nanofiltration and reverse osmosis are combined to validate clarification, selective separation and concentration.

This reference is for comparison; a new duty requires its own engineering validation.

View case details →
Process equipment at the 200 kg/h Industrial Waste-Salt Resource-Recovery Pilot

Industrial Wastewater Reuse & ZLD

200 kg/h Industrial Waste-Salt Resource-Recovery Pilot

Project scale
200 kg/h industrial waste salt
Feed / process stream
Industrial waste salt and its dissolution liquor
Membrane sections
Pretreatment and dissolution → softening and PEK tubular membranes → NF salt separation and RO concentration → evaporation and crystallization

This pilot processes industrial waste salt and its dissolution liquor at a capacity of 200 kg/h of solid waste salt. Dissolution, softening, tubular solid-liquid separation, NF salt separation, RO concentration and subsequent crystallization are combined to validate the resource-recovery route.

This reference is for comparison; a new duty requires its own engineering validation.

View case details →
Process equipment at the 2,000 m³/d Aged Landfill Leachate Ammonia Stripping and Recovery Project

Industrial Wastewater Reuse & ZLD

2,000 m³/d Aged Landfill Leachate Ammonia Stripping and Recovery Project

Project scale
2,000 m³/d
Feed / process stream
Aged landfill leachate
Main process stages
Filtration and preheating → desorption and ammonia stripping → carbonation absorption → centrifugation and packaging

This 2,000 m³/d project treats aged landfill leachate through filtration, preheating, ammonia stripping, carbonation absorption and centrifugation. The route reduces the incoming ammonia load and links to ammonium-bicarbonate recovery.

This reference is for comparison; a new duty requires its own engineering validation.

View case details →
Process equipment at the 40 m³/h Vanadium-Mine Wastewater Softening and Membrane Treatment Project

Industrial Wastewater Reuse & ZLD

40 m³/h Vanadium-Mine Wastewater Softening and Membrane Treatment Project

Project scale
40 m³/h
Feed / process stream
Wastewater from vanadium-mine operations
Membrane sections
Chemical softening → PEK tubular membrane clarification → NF and RO concentration

This 40 m³/h project treats wastewater from vanadium-mine operations. Chemical softening and PEK tubular solid-liquid separation are followed by nanofiltration and reverse-osmosis concentration.

This reference is for comparison; a new duty requires its own engineering validation.

View case details →
Process equipment at the 5,000 m³/d Corn-Processing Wastewater Air-Lift MBR and Reuse Project

Industrial Wastewater Reuse & ZLD

5,000 m³/d Corn-Processing Wastewater Air-Lift MBR and Reuse Project

Project scale
5,000 m³/d
Feed / process stream
Biologically treated wastewater from corn processing
Membrane sections
Biological treatment and PEK Air-Lift MBR combined with reverse osmosis and activated-carbon adsorption

This 5,000 m³/d project treats corn-processing wastewater using biological treatment, PEK Air-Lift MBR, reverse osmosis and activated-carbon adsorption for deep treatment and water reuse.

This reference is for comparison; a new duty requires its own engineering validation.

View case details →
Process equipment at the 400 m³/h Photovoltaic Plant Cooling-Blowdown Reuse Project

Industrial Wastewater Reuse & ZLD

400 m³/h Photovoltaic Plant Cooling-Blowdown Reuse Project

Project scale
400 m³/h
Feed / process stream
Cooling-tower blowdown from photovoltaic production
Membrane sections
Softening pretreatment → PEK tubular membrane clarification → HRCC RO concentration → reuse

This project treats 400 m³/h of cooling blowdown from a photovoltaic plant. Softening, PEK tubular membrane clarification and HRCC reverse-osmosis concentration are combined for blowdown reduction and water reuse.

This reference is for comparison; a new duty requires its own engineering validation.

View case details →
Process equipment at the 4,500 m³/d High-Salinity Mine-Water Reuse Project

Industrial Wastewater Reuse & ZLD

4,500 m³/d High-Salinity Mine-Water Reuse Project

Project scale
4,500 m³/d
Feed / process stream
High-salinity, high-hardness mine water
Membrane sections
Dual-alkali softening → PEK tubular membrane clarification → high-concentration RO → reuse by duty

This 4,500 m³/d project treats high-salinity, high-hardness mine water. Dual-alkali softening, alkali-resistant tubular ultrafiltration and reverse-osmosis concentration are combined for reuse in mine production and auxiliary water systems.

This reference is for comparison; a new duty requires its own engineering validation.

View case details →
Process equipment at the 3,200 m³/d Leachate and 640 m³/d Concentrate NF Treatment Project

Industrial Wastewater Reuse & ZLD

3,200 m³/d Leachate and 640 m³/d Concentrate NF Treatment Project

Project scale
3,200 m³/d leachate; 640 m³/d concentrate
Feed / process stream
Landfill leachate and its concentrate
Membrane sections
Ultrafiltration pretreatment and leachate NF, with two-stage NF treatment of concentrate

This project has separate duties of 3,200 m³/d for landfill leachate and 640 m³/d for concentrate. Nanofiltration splitting and multistage concentrate treatment organize the permeate and concentrate streams for subsequent handling.

This reference is for comparison; a new duty requires its own engineering validation.

View case details →
Process equipment at the 25 m³/h Coal-Chemical Brine Salt-Separation Phase II Project

Industrial Wastewater Reuse & ZLD

25 m³/h Coal-Chemical Brine Salt-Separation Phase II Project

Project scale
25 m³/h
Feed / process stream
Coal-chemical RO brine
Membrane sections
Ultrafiltration pretreatment → two-stage NF salt separation → evaporation and crystallization

This phase II project treats 25 m³/h of coal-chemical RO brine. Ultrafiltration, nanofiltration salt separation, evaporation and crystallization are combined to process the resulting salt fractions.

This reference is for comparison; a new duty requires its own engineering validation.

View case details →
Process equipment at the 60 m³/h RO Brine and 4 m³/h Mother-Liquor Salt-Separation Project

Industrial Wastewater Reuse & ZLD

60 m³/h RO Brine and 4 m³/h Mother-Liquor Salt-Separation Project

Project scale
60 m³/h brine; 4 m³/h crystallization mother liquor
Feed / process stream
Coal-chemical RO brine and crystallization mother liquor
Membrane sections
Ultrafiltration pretreatment → two-stage NF salt separation → evaporation, crystallization and mother-liquor recovery

This coal-chemical project treats 60 m³/h of RO brine and 4 m³/h of crystallization mother liquor. The process combines ultrafiltration, two-stage nanofiltration, evaporation and crystallization, with a dedicated mother-liquor recovery duty.

This reference is for comparison; a new duty requires its own engineering validation.

View case details →
Process equipment at the 24 m³/d RO Brine Reuse and Salt-Separation Pilot

Industrial Wastewater Reuse & ZLD

24 m³/d RO Brine Reuse and Salt-Separation Pilot

Project scale
24 m³/d
Feed / process stream
Reverse-osmosis brine from coal-chemical production
Membrane sections
Ultrafiltration pretreatment → two-stage nanofiltration → validation of reuse and crystallization routes

This 24 m³/d pilot treats RO brine from coal-chemical production. Ultrafiltration and two-stage nanofiltration are combined to evaluate water reuse and selective salt treatment.

This reference is for comparison; a new duty requires its own engineering validation.

View case details →

PROJECT CONTEXT

Use references for comparison, not as a new-project guarantee