NEWS & INSIGHTS
Company Updates & Technical Insights
Company events, exhibition records, delivery milestones, and technical perspectives are kept separate from engineering case evidence. Project claims remain in the Case Studies library.

Plum at Shanghai International Water Exhibition 2026
9-11 June 2026 · National Exhibition and Convention Center (Shanghai) · Hall 7.1H, Booth H715. Plum presented tubular membranes and membrane-separation engineering directions.
Read the full article →Aquatech China 2025: Exhibition Review
5-7 November 2025 · Shanghai · Booth E6B03. Technical discussions covered PEK tubular membranes, ZLD, external MBR, selective NF, and HRCC.
→2025 China Membrane Industry Association Science & Technology Award Review Notice
This entry preserves the original website announcement route. Award title, level, and project attribution require final verification against the association notice and company certificate before production publication.
→2,200 m3/d Landfill Leachate Membrane System Completes FAT
A 2,200 m3/d membrane system for landfill leachate and concentrate treatment completed factory acceptance testing. FAT confirms manufacturing and agreed checks; it is not an onsite water-quality guarantee.
→Mine-Water Membrane System Manufactured and Shipped to Project Site
The mine-water membrane treatment equipment completed factory manufacturing and was shipped to the project site in Gansu. Shipment does not mean installation, commissioning, or performance acceptance is complete.
→Tubular Membrane TCO: From Membrane Price to Lifecycle Boundaries
A useful TCO review includes pretreatment, pumps and energy, chemicals and CIP, labor, downtime, replacement, sludge or concentrate handling, and the impact on downstream systems.
→FACT BOUNDARY