Case study

3,600 m³/d PCB Wastewater Heavy Metals Treatment Project

This project treats mixed wastewater containing heavy metals from PCB manufacturing at a project scale of 3,600 m³/d. The process combines pretreatment, PEK tubular membranes and reverse osmosis, with treated water reused in production.

Project scale
3,600 m³/d
Feed / process stream
PCB manufacturing wastewater containing heavy metals
Membrane sections
Pretreatment → PEK tubular membranes → reverse osmosis → production reuse
PEK tubular membrane equipment at the 3600 m³/d PCB wastewater heavy metals treatment project

Project overview

This project treats mixed wastewater containing heavy metals from PCB manufacturing at a project scale of 3,600 m³/d. The process combines pretreatment, PEK tubular membranes and reverse osmosis, with treated water reused in production.

Process route

Pretreatment → PEK tubular membranes → reverse osmosis → production reuse

The PEK tubular membrane stage sits between pretreatment and reverse osmosis and provides membrane filtration within the treatment train.