Case study
500 m³/d Chemical Wastewater Air-Lift MBR Project
This project treats wastewater from chemical manufacturing at a project scale of 500 m³/d. It combines biological treatment with air-lift tubular membrane solid-liquid separation and connects to downstream wastewater treatment.

Project overview
This project treats wastewater from chemical manufacturing at a project scale of 500 m³/d. It combines biological treatment with air-lift tubular membrane solid-liquid separation and connects to downstream wastewater treatment.
Process route
Biological treatment → air-lift tubular membrane solid-liquid separation → downstream wastewater treatment
The air-lift tubular membrane system separates solids from biological mixed liquor as an Air-Lift MBR application.